Services

Precision takeoffs, labor modeling & Division 09 finishes.

We take off Masonry, Millwork, Framing, Drywall, Siding and Finishes scopes — including public works and prevailing-wage bids — and consult on the pricing structure behind them.

01 · Division 04 — Masonry · 04 05 00–04 70 00 · Sheet 01 of 05

01Adhered & anchored masonry veneer, dimensional stone veneer and brick cladding quantities
02Cultured stone, cast stone trim and anchoring-system takeoffs by elevation
03Mortar bed quantities and exterior masonry detailing, priced separately from labor

02 · Division 06 — Finish carpentry & millwork · 06 20 00 / 06 40 00 · Sheet 02 of 05

01Finish carpentry (06 20 00): running trim, baseboard, crown molding and door/window casing linear counts
02Architectural millwork (06 40 00): custom cabinetry and interior paneling counts
03Tongue-and-groove (T&G) ceiling cladding, with pitch conversions off the RCP
04Cedar wall cladding, exposed beam and timber-framing linear detail

03 · Division 05/06 — Framing · 05 41 00 / 06 11 00 · Sheet 03 of 05

01Wood stud, plate and header member counts, taken off wall by wall
02Cold-formed metal (CFMF) stud and track quantities by gauge and spacing
03Blocking, sheathing and fastener quantities, broken out by assembly

04 · Division 09 29 00 — Drywall · 09 21 00–09 29 00 · Sheet 04 of 05

01Gypsum board sheet counts by wall and ceiling assembly, single- and multi-layer
02Fire- and sound-rated assembly quantities, tape, corner bead and finish-level breakdowns
03Suspended and furred ceiling grid quantities, coordinated with the RCP

05 · Division 07 46 00 — Siding · 07 46 00 · Sheet 05 of 05

01Lap, panel and shingle siding quantities by elevation, net of openings
02Trim, corner boards, flashing and fastener quantities, by detail
03Weather-resistive barrier and rainscreen quantities, priced separately from labor

06 · Division 09 — Finishes

09 91 00

Painting & Specialty Coatings

Interior/exterior paint, high-performance epoxies, wood stains, clear sealers and wallcoverings, scheduled by substrate.

09 30 00

Ceramic & Porcelain Tile

Large-format porcelain, quarry and natural-stone tile, thick-bed mortars, waterproofing membranes and epoxy grouts.

09 64 00

Wood & Hardwood Flooring

Solid and engineered hardwood, wide-plank timber and parquet, with moisture-underlayment and waste-factor allowances.

09 65 00 / 09 68 00

Resilient & Soft Flooring

VCT, LVT, sheet vinyl, rubber and carpet tile, with self-leveling underlayment and transition detailing.

06a · Finish assembly matrix

Filter by finish tag

The setting system and substrate prep behind a tile takeoff — a slice of what we map to every finish tag on a plan.

TagCategoryAssembly detail
CT-1Tile & stoneLarge-format porcelain floor tile, thin-set direct-bond over prepared substrate
QT-1Tile & stoneQuarry tile kitchen/back-of-house flooring, mortar-bed set for slope-to-drain
ST-1Tile & stoneNatural stone (marble, granite, travertine, slate) veneer or flooring, per finish schedule
SS-1Setting systemsModified thin-set mortar, direct-bond over concrete or cement board
SS-2Setting systemsEpoxy grout and setting system for high-traffic or chemical-exposure areas
SS-3Setting systemsSheet or liquid-applied waterproofing/uncoupling membrane beneath wet-area tile
SP-1Substrate prepSloped mortar bed or depressed-slab fill for shower pans and slope-to-drain floors
SP-2Substrate prepSelf-leveling underlayment over out-of-flat slabs ahead of thin-set tile
SP-3Substrate prepCrack-isolation membrane at slab joints and known crack lines before tile set

07 · Public works & prevailing wage

Certified-payroll-ready bids

Division 09 public-works bid packages, wage-rate classification review, certified-payroll labor mapping, and submittal-schedule audits — priced at a small premium over standard commercial rates to cover the extra compliance review.

08 · Business consulting

Beyond the takeoff

If your bids are priced by feel — no burdened labor rate, no true back-office overhead built in — we’ll build the model with you: payroll burden, shop and office overhead, margin strategy, and a live spreadsheet you actually use on the next bid. See pricing packages.

Get a scoped estimate

Whichever division your bid falls under, we’ll return quantities on a schedule set by project size and our current queue, confirmed up front.