Precision takeoffs, labor modeling & Division 09 finishes.
We take off Masonry, Millwork, Framing, Drywall, Siding and Finishes scopes — including public works and prevailing-wage bids — and consult on the pricing structure behind them.
01 · Division 04 — Masonry · 04 05 00–04 70 00 · Sheet 01 of 05
| 01 | Adhered & anchored masonry veneer, dimensional stone veneer and brick cladding quantities |
| 02 | Cultured stone, cast stone trim and anchoring-system takeoffs by elevation |
| 03 | Mortar bed quantities and exterior masonry detailing, priced separately from labor |
02 · Division 06 — Finish carpentry & millwork · 06 20 00 / 06 40 00 · Sheet 02 of 05
| 01 | Finish carpentry (06 20 00): running trim, baseboard, crown molding and door/window casing linear counts |
| 02 | Architectural millwork (06 40 00): custom cabinetry and interior paneling counts |
| 03 | Tongue-and-groove (T&G) ceiling cladding, with pitch conversions off the RCP |
| 04 | Cedar wall cladding, exposed beam and timber-framing linear detail |
03 · Division 05/06 — Framing · 05 41 00 / 06 11 00 · Sheet 03 of 05
| 01 | Wood stud, plate and header member counts, taken off wall by wall |
| 02 | Cold-formed metal (CFMF) stud and track quantities by gauge and spacing |
| 03 | Blocking, sheathing and fastener quantities, broken out by assembly |
04 · Division 09 29 00 — Drywall · 09 21 00–09 29 00 · Sheet 04 of 05
| 01 | Gypsum board sheet counts by wall and ceiling assembly, single- and multi-layer |
| 02 | Fire- and sound-rated assembly quantities, tape, corner bead and finish-level breakdowns |
| 03 | Suspended and furred ceiling grid quantities, coordinated with the RCP |
05 · Division 07 46 00 — Siding · 07 46 00 · Sheet 05 of 05
| 01 | Lap, panel and shingle siding quantities by elevation, net of openings |
| 02 | Trim, corner boards, flashing and fastener quantities, by detail |
| 03 | Weather-resistive barrier and rainscreen quantities, priced separately from labor |
06 · Division 09 — Finishes
09 91 00
Painting & Specialty Coatings
Interior/exterior paint, high-performance epoxies, wood stains, clear sealers and wallcoverings, scheduled by substrate.
09 30 00
Ceramic & Porcelain Tile
Large-format porcelain, quarry and natural-stone tile, thick-bed mortars, waterproofing membranes and epoxy grouts.
09 64 00
Wood & Hardwood Flooring
Solid and engineered hardwood, wide-plank timber and parquet, with moisture-underlayment and waste-factor allowances.
09 65 00 / 09 68 00
Resilient & Soft Flooring
VCT, LVT, sheet vinyl, rubber and carpet tile, with self-leveling underlayment and transition detailing.
06a · Finish assembly matrix
Filter by finish tag
The setting system and substrate prep behind a tile takeoff — a slice of what we map to every finish tag on a plan.
| Tag | Category | Assembly detail |
|---|---|---|
| CT-1 | Tile & stone | Large-format porcelain floor tile, thin-set direct-bond over prepared substrate |
| QT-1 | Tile & stone | Quarry tile kitchen/back-of-house flooring, mortar-bed set for slope-to-drain |
| ST-1 | Tile & stone | Natural stone (marble, granite, travertine, slate) veneer or flooring, per finish schedule |
| SS-1 | Setting systems | Modified thin-set mortar, direct-bond over concrete or cement board |
| SS-2 | Setting systems | Epoxy grout and setting system for high-traffic or chemical-exposure areas |
| SS-3 | Setting systems | Sheet or liquid-applied waterproofing/uncoupling membrane beneath wet-area tile |
| SP-1 | Substrate prep | Sloped mortar bed or depressed-slab fill for shower pans and slope-to-drain floors |
| SP-2 | Substrate prep | Self-leveling underlayment over out-of-flat slabs ahead of thin-set tile |
| SP-3 | Substrate prep | Crack-isolation membrane at slab joints and known crack lines before tile set |
07 · Public works & prevailing wage
Certified-payroll-ready bids
Division 09 public-works bid packages, wage-rate classification review, certified-payroll labor mapping, and submittal-schedule audits — priced at a small premium over standard commercial rates to cover the extra compliance review.
08 · Business consulting
Beyond the takeoff
If your bids are priced by feel — no burdened labor rate, no true back-office overhead built in — we’ll build the model with you: payroll burden, shop and office overhead, margin strategy, and a live spreadsheet you actually use on the next bid. See pricing packages.
Get a scoped estimate
Whichever division your bid falls under, we’ll return quantities on a schedule set by project size and our current queue, confirmed up front.